Friday, August 8, 2014

Kids are at risk of biological damage results from microwave radiation emitted by wireless devices

A scholarly article on wireless safety, published online in the Journal of Microscopy and Ultrastructure, reports that children and fetuses are the most at risk from neurological and biological damage that results from microwave radiation emitted by wireless devices, due to the higher rate of absorption of microwave radiation by children than by adults. The paper is available on the following 

The paper, titled "Why children absorb more microwave radiation than adults: The consequences," describes how the fetus is particularly vulnerable to microwave radiation, which can cause degeneration of the protective myelin sheath that surroundsbrain neurons.  The authors recommend that wireless toys be banned due to the serious potential health risks.
The paper also documents cancer registry studies showing increased brain cancerincidence. Because the average latency time between first exposure and diagnosis of a tumor can be decades, the total number of tumors induced in children may not be diagnosed until well into adulthood.
The authors explain that current exposure limits are based on the erroneous assumption that tissue damage from overheating is the only potential danger of wireless devices. However, extensive scientific reports document the non-thermal biological effects from chronic (long-term) exposures. Although government warnings have been issued worldwide, most of the public is unaware of such warnings.
Pediatric neurologist Dr. Maya Shetreat-Klein stated, "Pregnant women deserve to know that wireless radiation can have an impact on the developing brain. We're seeing alarming increases in the number of children diagnosed with neurological disorders over the past decade, and anything we can do that might help reduce that rate should be taken very seriously." during her remarks while launching the Baby Safe Project in New York this June.

The authors state that consumers are unaware that cellphones, tablets and laptop manuals have specific advice on recommended distances (20 cm rule for tablets/laptops and about ½ inch for cell phones) from the user in order to ensure compliance with exposure standards. Children and adults use wireless devices in ways that "violate" these recommendations, putting them at even increased risk.
The authors make specific recommendations:  pregnant women should avoid wireless exposures; children should not play with wireless toys; adolescent girls and women should not place cellphones in their bras or in hijabs; and government exposure limits need to be urgently revised.
The paper's authors include: Santosh Kesari, MD, PhD, Professor of Neurosciences at UC San Diego School of Medicine, and Director of Neuro-oncology at Moores UCSD Cancer Center; Devra Davis, PhD, MPH, cancer researcher, toxicologist, Founder and President of the Environmental Health Trust; L. Lloyd Morgan, Senior Science Fellow at the Environmental Trust.
Dr. Santosh Kesari investigates the biology of gliomas with the aim of developing new therapeutics for patients with brain tumors. He has an interest in neural development and cancer stem cells and focuses on their role in the formation of brain tumors and resistance to treatments.
Source:
UC San Diego School of Medicine

Tuesday, May 27, 2014

May 27, 2014

Parks Canada's proposal to make the National parks a vast network of hotspots was quickly denounced by people across Canada. Now they state that the proposed wireless hotspots in national parks would be restricted to visitor centers and campgrounds -- “not in the wilderness, and not in the back country,” says Andrew Campbell, Director of Visitor Experience with Parks Canada. Read more here….Link

© CAST, 2014

Sunday, May 18, 2014

Public Consultation for Safety Code 6

Safety Code 6 Review Continues... !!
Citing the first time ever safety codes have been opened up for public consultation, Health Canada released Friday their 60 day period accepting public and scientific input as part two of the process in updating SC6. This follows the conflicted RSC report delivered April 1st to Health Canada, and will result in the final version of SC6 scheduled to be released this coming fall.
C4ST is organizing efforts in order to have maximum impact over the next 60 days. We will be involving scientists and medical experts from around the world to provide vital input in the current science showing biological harm at levels much less than SC6.
Our campaign will launch later this coming week. 
Health Canada Launches Public Consultation on Safety Code 6
OTTAWA, May 16, 2014 /CNW/ - Today Health Canada launched a public consultation process to solicit feedback on a revised version of Safety Code 6. This Safety Code is Health Canada's guideline for recommended human exposure limits to radiofrequency electromagnetic energy, the kind of energy given of…
NEWSWIRE.CA

Wednesday, April 16, 2014

April 16, The Canadian Medical Journal

Federal Wi-Fi safety report is deeply flawed, say experts

An expert scientist says the Royal Society of Canada panel report "ignored recent evidence that wireless radiation is a probable carcinogen."


A new review of Health Canada's safety standards for radiofrequency devices, including Wi-Fi and
cellphones, is deeply flawed due to the authors' conflicts of interest and lack of expertise, say two
scientists. The Royal Society of Canada's (RSC) Expert Panel Report on the Review of Safety
Code 6: Potential Health Risks of Radiofrequency Fields endorses current safety standards while
calling for more research. The RSC invited the two scientists to peer review the report.

The RSC's eight-member panel "actively blinded themselves to vital evidence," says Martin Blank,
an expert on the effects of electromagnetic radiation and special lecturer at the Columbia University
Medical Center in New York City. "The panel's position on maintaining the current standards is so
 fixed that it leads them to conclusions one would never expect from policy officials in the field of
 health," Blank added in an interview. "I am almost certain that the reluctance of the panel to be
guided by biological evidence reflects a lack of expertise in cell biology."

Dr. Anthony B. Miller, professor emeritus at the University of Toronto's Dalla Lana School of
 Public Health, was likewise critical. The panel included members with "major links to the
 telecommunications industry," says Miller. "This is a conflicted panel, with insufficient expertise
in epidemiology. It ignored recent evidence that wireless radiation is a probable carcinogen."

Miller flagged concerns about the panel last summer after a CMAJ article revealed that the RSC
panel's original chair, Daniel Krewski, failed to disclose to the society that he had received a
$126 000 contract in 2008–2009 from Industry Canada. Krewski was replaced as panel chair.

Amidst concerns about links between the telecommunication industry and John Moulder, professor
and director of radiation biology at the Medical College of Wisconsin, in Milwaukee, Wisconsin,
two members of the original panel stepped down and were also replaced. Moulder remained on the
panel.

These changes to the panel remained unsatisfactory, says Miller. "It is unfortunate that the
Royal Society failed to amend the membership of the panel as requested by some of us."

After reviewing the panel's final report, Miller and Blank now say that the RSC, which was
paid $100 000 by Health Canada to establish the review panel, failed in its obligation to the public.

"This is actually a failure of the panel to fulfil its primary function — to protect the health of the
population," says Blank. "This failure is occurring in an environment with increasing exposure
to a wide range of non-ionizing EMF [electromagnetic frequencies], including ELF [extremely
low-frequency]. To do the job right, the panel should be reconstituted to include members having
the expertise needed to evaluate the biological research and to formulate safety standards that take
into account the biological indicators of EMF danger levels."

Instead of outsourcing the safety review to the RSC, which is not subject to government
accountability and transparency rules, Miller suggests Health Canada should conduct the safety
review internally, using traditional expert advisory panel review procedures which are far more
accountable. "That is a process that is far better."

Frank Clegg, CEO of Canadians for Safe Technology (C4ST), an Oakville, Ontario-based advocacy
group that campaigns against the dangers of exposure to unsafe levels of wireless radiation from
technology, says the RSC's panel was "an expensive exercise that was corrupted by industry and
so is a waste of taxpayer dollars."

Russel MacDonald, officer on expert panels at the RSC in Ottawa, Ont., did not respond to an
interview request.

Sarah Lauer, a media officer with Health Canada, says the department is reviewing the panel's
 April 1 report and "will consider the RSC's recommendations, as well as all feedback received
during the upcoming public consultation on Safety Code 6." The revised Code is expected to be
 published in the fall of 2014.  The RSC, she added, "notes that there are no established adverse
health effects at exposure levels below the proposed limits.

DOI:10.1503/cmaj.109-4785
— Paul Christopher Webster, Toronto, Ont.

Monday, April 14, 2014

April 14, 2014




April 14, 2014

For Immediate Release

Two Scientists Break Silence on "Major Flaws" in Royal Society's Recent Report on Safety Code 6

Ottawa - Two peer reviewers involved in this month's Royal Society report on wireless safety say the results cannot be trusted, because the Panel ignored evidence that wireless radiation is harmful to humans.

The scientific reviewers also said key panelists were in conflict of interest as they regularly accept funding from wireless and energy companies.

One of the reviewers, Dr. Martin Blank, holds two PhD's and has published more than 200 papers at Columbia University on the health effects of wireless radiation. The other reviewer, Dr. Anthony Miller MD, is Professor Emeritus at the Dalla Lana School of Public Health at the University of Toronto.

Both say the Royal Society panel ignored scientific evidence published over the past five years. As peer reviewers, they noted some panelists were conflicted and others lacked sufficient expertise.

"The Royal Society panel has failed in its obligation to the public," said Dr. Miller. "It ignored recent evidence that wireless radiation is a probable carcinogen." Dr. Miller said he is most concerned about involuntary exposure, such as children exposed to Wi-Fi in schools.

Dr. Blank said the Royal Society dismissed definitive studies that prove wireless radiation causes harm to human cells, including sperm cells when men carry phones in their pockets. "We don't need further study to lower safety limits," said Dr. Blank. "There is already enough evidence to recommend lower limits for wireless radiation in Canada."

The Royal Society's panel has been mired in controversy. Last summer, the original Chair resigned after a conflict of interest was exposed in the media. The Royal Society promised to publish the remaining scientists' conflicts in its final report, but did not.

Background: www.C4ST.org/break-silence
Interviews: media@c4st.org
PH: 705-444-9662
  

Wednesday, April 2, 2014

April 2, 2014


Good Afternoon,

For the past year C4ST and Canadians such as yourself have been working diligently to bring awareness to the industry conflicted panel at the Royal Society of Canada reviewing Safety Code 6. This morning in Ottawa, the review was made public. Click HERE to see our press conference and reaction.  

As expected, despite phenomenal increases in technology use and resulting exposure to wireless radiation, the industry-conflicted panel chose to side with the profitable and powerful wireless industry and ignore domestic and worldwide published peer reviewed science warnings of related health risks.
This RSC review is an expensive exercise that was corrupted by industry and so is a waste of taxpayer dollars. In spite of the original panel chair having been forced to resign due to his previously un-disclosed industry conflict, the panel contrived to ignore important medical and scientific data. Without full disclosure of all panel member conflicts, this report’s findings are questionable at best. Rather than providing value to Health Canada, RSC’s rubber stamp leaves Canadians exposed to unprecedented risk.

At this time we call upon Health Canada to distance themselves from this industry review of Canada’s wireless safety codes, and publicly lay out the next steps in the review process they have publicly committed to.

Health Canada - "Following receipt of the report from the RSC, anticipated in March 2014, Health Canada will consult further with Canadians prior to finalizing the revised Safety Code 6."

Health Minister Ambrose is building a track record of improving transparency within Health Canada. This is a tremendous opportunity for her to direct that focus on the process used to update Safety Code 6. We ask you to please send Health Minister Ambrose encouragement to follow through on their commitment for Canadian's input before finalizing the review, and open up the process to a transparent look at the current research finding great harm at levels much less than Safety Code 6.

Sincerely,

Frank Clegg
CEO - C4ST

Tuesday, February 11, 2014

Le 10 février, 2014

Monsieur Daniel Brassard,                                                                                                                      
Conseiller Services Immobilier et Relations Municipales.                                                                                   
200 Boul.Bouchard, 5CS                                                                                                                                         
Dorval. Qc. H9S 5X5
Sutton Jonction le 10 février 2014.
En réponse à votre lettre, nous citoyens de la communauté de Sutton-jonction ne pouvons accepter votre proposition, afin de préserver nos qualités de vies.
Les documents que vous nous avez fournis ne nous ont pas convaincus et en cas de doute pour la santé de nos enfants, sommes obligés de refuser. Les scientifiques s’accordent à  classer les antennes du genre : « 2A » , étant cancérigènes. D’ailleurs le code de sécurité 6 est actuellement contesté à Ottawa.
Au lieu de vous évertuer à vouloir spolier notre environnement, pourquoi  ne feriez-vous pas volte-face et trouver d’autres solutions plus adéquates pour préserver notre région. Cela existe déjà aux États-Unis, où des compagnies comme la vôtre ouvrent et partagent les réseaux existants comme la fibre optique en implantant des relais moins invasifs et plus durables. Celle-ci passe devant notre porte et par ailleurs nous sommes déjà pleinement couverts.
Cela vous mettra dans une position de leader où l’on pourrait vous admirer pour votre attention envers diverses communautés, au lieu de cette attitude corporatiste d’une personne à la morale psychopathe.
Les vents changent, voir l’annexe, il va vous falloir dès à présent montrer patte blanche, on est maîtres chez-nous.
Nous sommes aussi prêts à nous battre pour épargner la ville des argents que vous lui réclameriez en cas de non construction de la tour par vos représentations dolosives.

Il est temps d’admettre que votre projet  «F1416 Mansville » était une erreur en d’en faire amendement honorable, vous avez sûrement des assurances pour ce genre de cas.

S’il vous faut absolument une tour dans notre secteur, la Ville de Sutton vous indiquera les possibilités et dorénavant ne pourra être sur terrain privé.
Pour fin de non-recevoir.

Olivier Burnham.
Annexe :
Bonjour!

Voici l’annonce qu’a faite James Moore à midi sur les tours de télécommunication et les communautés.

Ça devrait vous intéresser.
La version anglaise suit.


CATHERINE LUSSON
Adjointe de circonscription | Constituency Assistant
Bureau du député Pierre Jacob | MP Pierre Jacob’s Office
Nouveau Parti démocratique | New Democratic Party
______________________________________________________
(TEL): 819-868-1305 | (FAX) 819-868-5609
Sans frais : 1-866-683-5538
npd.ca | ndp.ca


Le gouvernement Harper modifie les règles sur l'emplacement des pylônes de téléphonie cellulaire
Les nouvelles règles permettront aux Canadiens d'avoir un mot à dire au sujet des pylônes dans leur collectivité
Le 5 février 2014 — Ottawa — Industrie Canada
Au cours des 20 dernières années, les services sans fil sont devenus une nécessité de tous les jours pour les consommateurs canadiens. Leur utilisation a entraîné une augmentation du nombre de pylônes de téléphonie cellulaire dans nos collectivités. La détermination de l'emplacement de ces pylônes devient de plus en plus problématique, compte tenu de la croissance soutenue de la demande pour les services sans fil.
Les Canadiens devraient avoir un mot à dire sur la manière dont les emplacements de nouveaux pylônes sont choisis dans leur collectivité. Des améliorations à la politique d'Industrie Canada sur l'emplacement des pylônes d'antennes mettront les résidents et les administrations municipales à l'avant-scène du processus de sélection des emplacements des pylônes.
À la suite des changements à la politique, les entreprises devront :
  • consulter la collectivité au sujet de toute nouvelle installation de pylône commercial, peu importe sa hauteur;
  • construire tout pylône dans les trois ans suivant la consultation;
  • faire en sorte que les résidents soient bien informés des consultations à venir.
Les améliorations à la politique favoriseront également la communication entre le gouvernement fédéral et le public à l'égard des procédures menant au choix de l'emplacement des pylônes d'antennes. De nouvelles ressources seront mises en ligne, tandis que de nouvelles procédures de déclaration faciliteront le suivi des enjeux et la communication avec les citoyens.
Ces mesures font fond sur les politiques actuelles du gouvernement Harper en matière de partage des pylônes d'antennes. Les entreprises doivent étudier la possibilité de partager l'infrastructure déjà en place, dans la mesure du possible, afin de réduire le nombre de pylônes devant être construits dans les collectivités.
Les consommateurs canadiens veulent que les décisions de leur gouvernement donnent lieu à plus de choix, à des prix plus bas et à de meilleurs services dans le secteur du sans-fil.Au cours des semaines à venir, le gouvernement du Canada continuera à collaborer avec l'industrie du sans-fil pour répondre plus adéquatement aux préoccupations des citoyens à l'échelle locale.
Consultez la fiche d'information pour en savoir plus à ce sujet.
Les faits en bref
  • En vertu de la politique actuelle sur l'emplacement des pylônes de téléphonie cellulaire, les entreprises sont seulement tenues de consulter la collectivité lorsqu'elles prévoient construire un pylône d'une hauteur de plus de 15 mètres.
  • Avant de construire un pylône, une entreprise doit examiner les autres options, dont celle de partager l'utilisation d'un pylône se trouvant déjà dans la zone en question.
  • Afin d'assurer la sécurité de la population, tous les pylônes d'antennes, peu importe leur hauteur, leur emplacement ou leur puissance, doivent être conformes aux exigences techniques d'Industrie Canada et aux normes de Santé Canada.
Citation
« Le choix de l'emplacement des nouveaux pylônes de téléphonie cellulaire est une question souvent controversée dans les collectivités canadiennes. Il est essentiel que les résidents se trouvent au cœur du processus de sélection de l'emplacement des nouveaux pylônes, et l'industrie du sans-fil doit tenir compte du point de vue des citoyens. Ces nouvelles règles donneront aux collectivités une meilleure occasion de se prononcer sur l'emplacement des nouveaux pylônes. »
— Le ministre de l'Industrie, James Moore
Produits connexes
  • Fiche d'information : Modifications à la politique canadienne sur l'emplacement des pylônes d'antennes
  • Discours : Modifications à la politique d'Industrie Canada sur l'emplacement des pylônes d'antennes
Lien connexe
  • Industrie Canada : Bâtis d'antennes
Suivez-nous sur Twitter : @industriecanada
Renseignements :
Jake Enwright
Attaché de presse
Cabinet du ministre de l'Industrie
613-995-9001

Relations avec les médias
Industrie Canada
613-943-2502
relations-medias@ic.gc.ca

Saturday, February 8, 2014

Febuary 8. 2014

For information about the towers in Frelighsburgh: Les tours à Frelighsburgh :
http://frelighsburg-preservation.com

Les tours à Potton : For information about the towers in Potton
http://www.thecelltowers.org

Friday, January 31, 2014

Jan 31, 2014

Link to PDF file  for the  RAPPORT D'ANALYSE DE CONFORMITE DES NIVEAUX DE RAYONNEMENTS RF SELON LES NORMES DU CODE DE SECURITE 6 MANSVILLE F1416 

DECEMBRE 2013 

 Preparé pour Bell Mobilité 



Tuesday, January 28, 2014

Jan. 28. 2014

From: daniel.brassard@bell.ca
To: dandeneault@gmail.com; p.menard@sutton.ca; r.girard@sutton.ca; winstonbresse@sympatico.ca; khill@nuera-ind.com; ollham@hotmail.com;storyland3@hotmail.com; robert.regimbald@ic.gc.ca; francois.belanger@bell.ca; alexandre.pelletier@bell.ca; michel.lavoie@bell.ca
Date: Wed, 15 Jan 2014 16:28:37 -0500
Subject: TR: P-2013149 - F1416 Mansville - étude Code 6

Le 15 janvier 2014

Bonjour à tous,

Par la présente, je vous fait parvenir ce rapport préparé par une source indépendante concernant la radiation des antennes qui seront installées éventuellement dans la tour à Sutton Jonction dans l’emplacement de la sablière Municipale.  Ce rapport à été préparé en vue de répondre à la préoccupation des résidents du secteur et sur  le commentaire qu’a émis Mr Burnham le 14 novembre 2013 : « Pour nous la santé des citoyens est prioritaire à la santé des portefeuilles des actionnaires de Bell…. »

L’étude démontre l’effet de rayonnement des antennes à l’intérieur et à l’extérieur (toitures) des résidences localisées dans le secteur de la nouvelle tour. Cette étude couvre une superficie de 200m à 360® du centre de la tour ce qui inclus la plupart des résidences du village.

Je vous laisse la liberté de lire la conclusion et selon le processus de Industrie Canada, vous avez 21 jours pour offrir vos commentaires ou questionnement sur ce rapport qui répond à l’ultime préoccupation des citoyens.

Par la présente, je vous prie de croire en nos salutations les meilleures.


Daniel Brassard
Conseiller Services Immobilier et Relations Municipales
200 Boul.Bouchard, 5CS
Dorval. Qc. H9S 5X5
( 514.778.6536

Thursday, November 14, 2013

November 14, 2013


Monsieur Daniel Brassard,                                                                                                                      
Conseiller Services Immobilier et Relations Municipales.                                                                                   
200 Boul.Bouchard, 5CS                                                                                                                                         
Dorval. Qc. H9S 5X5

Nous accusons réception de votre lettre du 29 octobre 2013

Les citoyens de Sutton Junction directement  affectés par la décision de Bell d’implanter une tour de télécommunication à proximité de nos demeures et autres membres de notre communauté opposés à votre projet, notamment les signataires de la pétition déposée chez-vous le 19 juin 2013, n’ont, à ce stade, aucun commentaire à y apporter et ce, pour les raisons suivantes :

1.     Le « permis » d’Industrie Canada pour la construction d’une tour à Sutton Junction a été obtenu sous de fausses représentations, notamment les fausses affirmations de Bell à l’effet que le processus prévu dans la directive CPC-2-0-03 avait été suivi;
2.     De là, vous avez induit la Ville de Sutton en erreur en leur représentant faussement que vous aviez les autorisations nécessaires pour aller de l’avant;
3.     Vous avez tenté d’induire en erreur le Conseil municipal de la Ville de Sutton ainsi que tous les citoyens présents à l’assemblée du Conseil tenue le 3 octobre en affirmant que les citoyens concernés n’avaient pas respecté les délais de réponse, poussant même la bêtise jusqu’à affirmer que Bell avait expédié par la poste des lettres postdatées (portant la date du 21 mai 2013) une semaine avant cette date pour s’assurer qu’elles seraient livrées à temps (sic)!
4.     Personne ne nous a convaincu à date de la nécessité d’une tour dans le secteur;
5.     Qui plus est, personne ne nous a convaincu de l’absence de danger pour la santé des citoyens suite à l’érection d’une tour;
6.     Pour nous, la santé des citoyens est prioritaire à la santé des portefeuilles des actionnaires de Bell.

Tant et aussi longtemps que le processus ne sera pas refait conformément à la Loi nous n’aurons rien à ajouter mais nous entendons utiliser tous les moyens à notre disposition pour contrer l’érection de la tour.

Nous sommes toutefois avisés que la Ville de Sutton, suite à la résolution du Conseil du 3 octobre, a confié à monsieur Réal Girard, directeur de l’urbanisme de la Ville, le soin de discuter avec vous d’un possible autre emplacement pour la tour et nous suivons de près, avec la pleine collaboration des autorités municipales, ces discussions et aviserons en temps et lieu mais, en toutes circonstances, le processus prévu dans la Loi devra être suivi.

Copies à :
Mr. Louis Dandenault (Maire de Sutton).
Mr. Pierre Ménard (Directeur général de la Ville de Sutton).
Mr. Réal Girard (Directeur de l’urbanisme et de l’aménagement du territoire de la Ville de Sutton).
Mr. Robert Regimbald d’industrie Canada.
Mr. Alexandre Pelletier de Bell Canada.
Mr. François Bélanger de Bell Canada.
Mr Pierre Jacob, député Fédéral de Brôme Missisquoi.

Pour faire valoir ce que de droit.
Olivier Burnham.

Sunday, October 20, 2013

October 20, 2013


The updated thread with all correspondence with Chris Freeman, Industry Canada and Daniel Brassard. Shows an accurate timeline and the incompetence of Industry Canada to date.

Attn:   Robert Régimbald
          Daniel Brassard
          Alexandre Pelletier
          Francois Belanger


In regards to Mister Brassard and Mister Régimbald’s emails, dated October 9th, 2013 and October 17th, 2013 respectively, please find our response as follows:

Mister Brassard wrote:
“A CPC (public consultation) as per the required CPC-2-0-03 was held from the 21st to the 21st June 2013 in Sutton-Jonction.”

Mister Régimbald wrote:
“On file, we have a copy of the notification file dated May 21st, 2013 that was sent to concerned residents by Bell Mobility…”

First off, no one disputes the date on the cover letter. It is clearly dated May 21, 2013. As well, the date of response clearly states June 22, 2013. These are documented facts.

The issue is what constitutes thirty days, as is specified in Section 4.2-2 of Industry Canada’s directive CPC-2-0-03:

“It is the proponent's responsibility to ensure that the notification provides at least 30 days for written public comment.”

As Mr. Régimbald states above, the file dated was sent May 21. Is this correct? We have no way of knowing when it was sent. Do you? Have you documentation of the date the package was sent? According to CPC-2-0-03 guidelines proponents “must keep a record of all associated communications.”

You certainly do not have documentation of when it was received by the local public. Why was the notification sent parcel post? Why was it not sent registered mail as we did with our response?

For the sake of this argument, we will take Mr. Brassard’s word that notification was sent May 21. This would mean the earliest the package would have been delivered to our communal post boxes would have been May 23 or 24.

Assuming us irregular rural residents check our mail daily – again, why was notification not sent by registered mail – the thirty days for written public comment would have been June 22 or 23. In other words, we would have had to mail our response by one of these dates.

June 22 was not the deadline date for Bell Mobility to receive our response but the date we were to send our response – you cannot have it both ways, one set of rules for your correspondence and another for ours.

These are time sensitive documents and must be respected as such.

We, the one hundred plus citizens of Sutton Junction sent our response June 20th, by registered mail. The package was signed for as received on June 25th, 2013 as can be verified by on-line tracking the attached receipts.

Therefore, it is clear Mr. Brassard and Bell Mobility are not in compliance with Industry Canada’s guidelines.


Secondly, if for some aberrant reason you wish to dispute the first argument, Bell Mobility still received our response on time:

June 22, 2013 – the date stated in Bell Mobility’s cover letter for public response was a Saturday. Sunday was the 23rd and June 24 was a provincial holiday. This would mean the deadline would actually of been June 25th. Which, as we have documented is the date Bell Mobility received our response.


Thirdly, on October 3rd, 2013 a unanimous resolution by the Sutton town council was made to halt the construction of the cell tower at 1111 chemin de la Vallee. The resolution was drafted on the 8th of October. Are you aware of this?

(Please read attached resolution)

If you are aware of this Mr. Régimbald, on what grounds do you claim in your email: “We will be able to assess compliance to the procedures outlined in the CPC-2-0-03.”

Does Industry Canada really wish to challenge a municipal resolution?


Furthermore, our numbers are growing each day, and we have now partnered with citizens’ groups in Potton and Bolton, Quebec. As well we have partnered with Canadians for Safe Technology (C4ST). Additionally, the press is becoming more numerous and more aware of our cause.


In closing, as to your additional query, Mr. Brassard: “Can you also tell me the names (residents of Sutton-Junction), who did not receive the CPC documents that were sent by mail?”

Why do you not know this? This is your responsibility as outlined in CPC-2-0-03. And why would you send me notification at 101, chemin Lakeside, Knowlton? I have not lived there for over ten years.

Until you, Mr. Régimbald and Mr. Brassard are able to address these inconsistencies, we have no faith in Industry Canada or Bell Mobility serving any of our community’s needs, telecommunication or otherwise.

Sincerely,

Chris Freeman,
Sutton Junction Citizens Group

P.S. I will be out of the country for several weeks. During my absence please correspond with Gilles Globensky: gillesglobensky@videotron.ca, Olivier Burnham: ollham@hotmail.com andPierre Ménard, OMA, town manager: p.menard@sutton.ca    


“Everything you have always wanted is just outside your comfort zone."

Your task is not to seek for love, but merely to seek and find all the barriers within yourself that you have built against it.”  
Rumi




Subject: RE: cell tower, Sutton Junction, Qc
Date: Thu, 17 Oct 2013 13:21:56 -0400
From: Robert.Regimbald@ic.gc.ca
To: storyland3@hotmail.com
CC: Robert.Regimbald@ic.gc.ca; daniel.brassard@bell.ca

Dear Sir,
On file, we have a copy of the notification file dated May 21st 2013 that was sent to concerned residents by Bell Mobility and a copy of the public notice that appeared in a local newspaper for the site located at 1111 chemin de la Vallee in Sutton.
At this time Bell is investigating the assumption that some residents did not receive the notification file. Once this matter is clarified, we will be able to assess compliance to the procedures outlined in the CPC-2-0-03. 
Best regards,
Robert Régimbald
Agent Gestion du Spectre | Spectrum Management Officer
Direction Générale des Opérations de la Gestion du Spectre | Spectrum Management Operations Branch
Industrie Canada | Industry Canada
975, boulevard St-Joseph Pièce 222, Gatineau QC J8Z 1W8 | 975 St-Joseph Blvd Room 222, Gatineau QC J8Z 1W8
Robert.Regimbald@ic.gc.ca
Téléphone | Telephone 819-953-1324
Télécopieur | Facsimile 819-953-8164
Téléimprimeur | Teletypewriter 1-866-694-8389
Gouvernement du Canada | Government of Canada 

De : Christopher Freeman [mailto:storyland3@hotmail.com]
Envoyé : le 1 octobre 2013 17:23
À : Regimbald, Robert: DGSO-DGOGS
Objet : RE: cell tower, Sutton Junction, Qc

Thank you for finally responding, Robert.

I'm glad to hear you spoke with one of Bell Mobility's representatives.

It appears they are being as forthright with you as they have been with us.

I assure you Bell Mobility did not hold any public consultation as is outlined in the CPC-2-0-03. In fact Bell Mobility mislead a local newspaper and announced they were not going to build in Sutton Junction at all.

According to your protocol:


Responding to the Public
Proponents are to address all reasonable and relevant concerns, make all reasonable efforts to resolve them in a mutually acceptable manner and must keep a record of all associated communications. If the local public or land-use authority raises a question, comment or concern relating to the antenna system as a result of the public notification process, then the proponent is required to: 
  1. respond to the party in writing within 14 days acknowledging receipt of the question, comment or concern and keep a record of the communication;
  2. address in writing all reasonable and relevant concerns within 60 days of receipt or explain why the question, comment or concern is not, in the view of the proponent, reasonable or relevant; and
  3. in the written communication referred to in the preceding point, clearly indicate that the party has 21 days from the date of the correspondence to reply to the proponent's response. The proponent must provide a copy of all public reply comments to the local Industry Canada office.
Responding to reasonable and relevant concerns may include contacting a party by telephone, engaging in a community meeting or having an informal, personal discussion. Between steps 1 and 2 above, the proponent is expected to engage the public in a manner it deems most appropriate. Therefore, the letter at step 2 above may be a record of how the proponent and the other party addressed the concern at hand.

None of the above was done. Our community was only met with silence. The fact that Bell Mobility did not respond in writing (2.) within 60 days to any resident's concerns, makes there proposal null and void.

Bell Mobility clearly did not follow your guidelines and it seems they are being dishonest with you to cover their tracks.

There are over 100 local citizens who are furious with this situation. We have begun protesting the site and momentum grows. The press is now involved as well as several lawyers who assure us that Bell Mobility did not follow Industry Canada guidelines.

Please consult further with Bell Mobility's representative. We expect the truth to be uncovered.

Sincerely,

Chris Freeman,
Sutton Junction Citizens Representative




“Everything you have always wanted is just outside your comfort zone."

Your task is not to seek for love, but merely to seek and find all the barriers within yourself that you have built against it.”  
Rumi




Subject: RE: cell tower, Sutton Junction, Qc
Date: Tue, 1 Oct 2013 09:12:19 -0400
From: Robert.Regimbald@ic.gc.ca
To: storyland3@hotmail.com
CC: Robert.Regimbald@ic.gc.ca


Dear Sir,
We thank you for your correspondence in wich you raise concerns on a Bell Mobility project in Sutton. Prior to forwarding your e-mail to Bell Mobility for their response on the public consultation issue, as it is their responsability to respond to your concerns, I have spoken to one of their representatives this morning and he mentionned that the public consultation for that site has been performed according to the procedure outlined in the CPC-2-0-03 and that Bell responded in a satisfactory manner to concerns raised during the consultation period which ended on May 21st 2013. 
As for the issuance of a radio licence relative to this site and the requested moratorium, I would like to inform you that Bell Mobility holds a spectrum licence issued by Industry Canada which allows the deployment of antenna systems in various locations within their authorized territory, provided that they fully comply with the procedures outlined in  the CPC-2-0-03. Thus, sites selected by Bell that are in compliance with the CPC-2-0-03 are pre-authorized as per their spectrum licence and do not require further approval by the department.
Best regards,
Robert Régimbald
Agent Gestion du Spectre | Spectrum Management Officer
Direction Générale des Opérations de la Gestion du Spectre | Spectrum Management Operations Branch
Industrie Canada | Industry Canada
975, boulevard St-Joseph Pièce 222, Gatineau QC J8Z 1W8 | 975 St-Joseph Blvd Room 222, Gatineau QC J8Z 1W8
Robert.Regimbald@ic.gc.ca
Téléphone | Telephone 819-953-1324
Télécopieur | Facsimile 819-953-8164
Téléimprimeur | Teletypewriter 1-866-694-8389
Gouvernement du Canada | Government of Canada 
 



From: Christopher Freeman [mailto:storyland3@hotmail.com]
Sent: Tuesday, September 24, 2013 5:30 PM
To: Spectrum Publications - Publications du Spectre
Subject: cell tower, Sutton Junction, Qc

Good Afternoon,

I am writing on behalf of the residents of Sutton Junction, Qc.

In brief:

We opposed the proposal by Bell Mobility to build a 60 metre cell tower in our backyard. After the fact, Bell Mobility did not hold any public consultations - despite our concerns.

Furthermore, after we made them aware of our concerns, Bell Mobility deceived the residents by publicizing that they were not going to build said tower and that they were selecting an alternative location in another region.

They began work on the tower on Monday in Sutton Junction!

We are familiar with the guidelines by Industry Canada regarding Antenna Systems (CPC-2-0-03). Bell Mobility has not honoured this agreement.

Are you aware of this? Why have you given them a licence for this project?

Our community is outraged by this deception.

We request a moratorium on the the project until our concerns are addressed.

Please take this under advisement and proceed asap.

We will send a detailed report including timeline, petition and copy of the misleading article by Bell Mobility once you have provided a contact name we can submit this to.

Until then, we will consider legal advisement as well as notify the media. 

Thank you for your support,

Christopher Freeman,
Citizens Group Sutton Junction

“Everything you have always wanted is just outside your comfort zone."

Your task is not to seek for love, but merely to seek and find all the barriers within yourself that you have built against it.”  
Rumi






From: Christopher Freeman [mailto:storyland3@hotmail.com] 
Sent: Tuesday, September 24, 2013 5:30 PM
To: Spectrum Publications - Publications du Spectre
Subject: cell tower, Sutton Junction, Qc
Good Afternoon,
I am writing on behalf of the residents of Sutton Junction, Qc.
In brief:
We opposed the proposal by Bell Mobility to build a 60 metre cell tower in our backyard. After the fact, Bell Mobility did not hold any public consultations - despite our concerns.
Furthermore, after we made them aware of our concerns, Bell Mobility deceived the residents by publicizing that they were not going to build said tower and that they were selecting an alternative location in another region.
They began work on the tower on Monday in Sutton Junction!
We are familiar with the guidelines by Industry Canada regarding Antenna Systems (CPC-2-0-03). Bell Mobility has not honoured this agreement.
Are you aware of this? Why have you given them a license for this project?
Our community is outraged by this deception.
We request a moratorium on the the project until our concerns are addressed.
Please take this under advisement and proceed asap.
We will send a detailed report including timeline, petition and copy of the misleading article by Bell Mobility once you have provided a contact name we can submit this to.
Until then, we will consider legal advisement as well as notify the media. 
Thank you for your support,
Christopher Freeman,
Citizens Group Sutton Junction



spectrum_pubs@ic.gc.c a (spectrum_pubs@ic.gc.ca) Add to contacts 25/09/2013
To: spectre.region.quebec@ic.gc.ca
Cc: storyland3@hotmail.com


Good morning, 
Please see below Mr. Freeman’s enquiry – for your reply.
Thank you,
Spectrum Publications
Publications du Spectre


From: Christopher Freeman [mailto:storyland3@hotmail.com] 
Sent: Friday, September 27, 2013 5:14 PM
To: Spectrum Publications - Publications du Spectre
Subject: RE: cell tower, Sutton Junction, Qc
We are waiting on your response. Just because you do not share your name does not mean you are not implicated in this unlawful act.
Please respond, asap.

spectrum_pubs@ic.gc.c a (spectrum_pubs@ic.gc.ca) Add to contacts 30/09/2013
To: storyland3@hotmail.com
Cc: spectre.region.quebec@ic.gc.ca
                        

Mr. Freeman,

Your enquiry was forwarded to the Quebec regional district office on September 25th for a reply.
Regards,
Spectrum Publications
Publications du Spectre

Subject: RE: cell tower, Sutton Junction, Qc
Date: Tue, 1 Oct 2013 09:12:19 -0400
From: Robert.Regimbald@ic.gc.ca
To: storyland3@hotmail.com
CC: Robert.Regimbald@ic.gc.ca
Dear Sir,
We thank you for your correspondence in wich you raise concerns on a Bell Mobility project in Sutton. Prior to forwarding your e-mail to Bell Mobility for their response on the public consultation issue, as it is their responsability to respond to your concerns, I have spoken to one of their representatives this morning and he mentionned that the public consultation for that site has been performed according to the procedure outlined in the CPC-2-0-03 and that Bell responded in a satisfactory manner to concerns raised during the consultation period which ended on May 21st 2013. 
As for the issuance of a radio licence relative to this site and the requested moratorium, I would like to inform you that Bell Mobility holds a spectrum licence issued by Industry Canada which allows the deployment of antenna systems in various locations within their authorized territory, provided that they fully comply with the procedures outlined in  the CPC-2-0-03. Thus, sites selected by Bell that are in compliance with the CPC-2-0-03 are pre-authorized as per their spectrum licence and do not require further approval by the department.
Best regards,
Robert Régimbald
Agent Gestion du Spectre | Spectrum Management Officer
Direction Générale des Opérations de la Gestion du Spectre | Spectrum Management Operations Branch
Industrie Canada | Industry Canada
975, boulevard St-Joseph Pièce 222, Gatineau QC J8Z 1W8 | 975 St-Joseph Blvd Room 222, Gatineau QC J8Z 1W8
Robert.Regimbald@ic.gc.ca
Téléphone | Telephone 819-953-1324
Télécopieur | Facsimile 819-953-8164
Téléimprimeur | Teletypewriter 1-866-694-8389
Gouvernement du Canada | Government of Canada  

 De : Christopher Freeman [mailto:storyland3@hotmail.com] 
Envoyé : le 1 octobre 2013 17:23
À : Regimbald, Robert: DGSO-DGOGS
Objet : RE: cell tower, Sutton Junction, Qc
Thank you for finally responding, Robert.
I'm glad to hear you spoke with one of Bell Mobility's representatives.
It appears they are being as forthright with you as they have been with us.
I assure you Bell Mobility did not hold any public consultation as is outlined in the CPC-2-0-03. In fact Bell Mobility mislead a local newspaper and announced they were not going to build in Sutton Junction at all.
According to your protocol:
Responding to the Public
Proponents are to address all reasonable and relevant concerns, make all reasonable efforts to resolve them in a mutually acceptable manner and must keep a record of all associated communications. If the local public or land-use authority raises a question, comment or concern relating to the antenna system as a result of the public notification process, then the proponent is required to: 
1.    respond to the party in writing within 14 days acknowledging receipt of the question, comment or concern and keep a record of the communication;
2.    address in writing all reasonable and relevant concerns within 60 days of receipt or explain why the question, comment or concern is not, in the view of the proponent, reasonable or relevant; and
3.    in the written communication referred to in the preceding point, clearly indicate that the party has 21 days from the date of the correspondence to reply to the proponent's response. The proponent must provide a copy of all public reply comments to the local Industry Canada office.
Responding to reasonable and relevant concerns may include contacting a party by telephone, engaging in a community meeting or having an informal, personal discussion. Between steps 1 and 2 above, the proponent is expected to engage the public in a manner it deems most appropriate. Therefore, the letter at step 2 above may be a record of how the proponent and the other party addressed the concern at hand.
None of the above was done. Our community was only met with silence. The fact that Bell Mobility did not respond in writing (2.) within 60 days to any resident's concerns, makes their proposal null and void.
Bell Mobility clearly did not follow your guidelines and it seems they are being dishonest with you to cover their tracks.
There are over 100 local citizens who are furious with this situation. We have begun protesting the site and momentum grows. The press is now involved as well as several lawyers who assure us that Bell Mobility did not follow Industry Canada guidelines.
Please consult further with Bell Mobility's representative. We expect the truth to be uncovered.
Sincerely,
Chris Freeman,
Sutton Junction Citizens Representative
“Everything you have always wanted is just outside your comfort zone."
Your task is not to seek for love, but merely to seek and find all the barriers within yourself that you have built against it.”  Rumi 

From: daniel.brassard@bell.ca
To: Robert.Regimbald@ic.gc.ca; storyland3@hotmail.com; spectre.region.quebec@ic.gc.ca; alexandre.pelletier@bell.ca; francois.belanger@bell.ca
Date: Wed, 9 Oct 2013 10:23:46 -0400
Subject: RE: cell tower, Sutton Junction, Qc
Dear Mr Freeman,
In regards to your memos sent to IC, please find our responses:
·         A CPC (public consultation) as per  the required CPC-2-0-03 was held from the 21st to the 21st June 2013 in Sutton-Jonction.
·         We did not receive any questions or demands from the community during thie CPC.
·         Your petition was received the following week after the cut-off date.
·         Please note that all landowners and tenants within 3 times height of tower(60M) received a complete information package. For exemple, you, Mr Freeman, received this documentation at the following 2 adresses: 1047, chemin Vallée (Roberta Lawrence) and 101, chemin Lakeside, Knowlton.
·         I can re-send this package to you if required.
It was written in your local newspaper that Bell would put up one tower instead of two in the Mansville area, which is the Sutton-Junction project. This was mistakenly written and should of been:...in the Mansonville area....  Our media group called the journalist on this issue and the corrected information was exchanged by all parties to everyone’s satisfaction.  You can call said journalist and he will confirm this for you.
The phrase you included in your memo as a conclusion: Your task is not to seek for love, but merely to seek and find all the barriers within yourself that you have built against it.”  Is very interesting and necessitates a moment of truth for all.  
If I may add, your answers to the following questions would be appreciated:
1.      What do you seek in the finality of this telecommunication tower?
2.      What are your suggestions for a win-win solution?
3.      Part of the community desires to have a good internet and cellular service in the area on a continued basis. How can you, as a citizen of this community who is not interested in such a service, find a solution that will be beneficial for all?
I await your responses and wish you a pleasant day.
Daniel Brassard
Conseiller Services Immobilier et Relations Municipales



De : Christopher Freeman [mailto:storyland3@hotmail.com] 
Envoyé : October 9, 2013 5:13 PM
À : Brassard, Daniel (6055312)
Cc : ollham@hotmail.com; gillesglobensky@videotron.ca
Objet : RE: cell tower, Sutton Junction, Qc 
Mr Brassard, 
Thank you for your correspondence. 
I will be meeting with several dozen citizens this evening in Sutton Junction. During which, I will present your email for discussion.
I will share with you the outcome before the end of the week. 
And yes, I agree - a win win solution for all stakeholders is most desirable.
Sincerely,
Chris Freeman,
Sutton Junction Citizens Group
“Everything you have always wanted is just outside your comfort zone."
Your task is not to seek for love, but merely to seek and find all the barriers within yourself that you have built against it.”  Rumi

From: daniel.brassard@bell.ca
To: storyland3@hotmail.com; francois.belanger@bell.ca; Robert.Regimbald@ic.gc.ca
Date: Fri, 11 Oct 2013 11:40:44 -0400
Subject: RE: cell tower, Sutton Junction, Qc

Mr Freeman,
I hope you are doing well.  How did the meeting go?  Do you have answers to my previous questions?
Can you also tell me the names (residents of Sutton-Junction), who did not receive the CPC documents that were sent by mail?
Thank you for your continued cooperation.
Daniel Brassard
Conseiller Services Immobilier et Relations Municipales
daniel.brassard@bell.ca
 514.778.6536

11/10/2013
To: daniel.brassard@bell.ca

The meeting went very well, thank you - many topics discussed. The committee will be meeting over the weekend to address the specifics of your questions and will respond at the beginning of next week.

Enjoy the long weekend.


Robert.Reg imbald@ic.g c.ca (Robert.Regimbald@ic.gc.ca) Add to contacts 17/10/2013
To: storyland3@hotmail.com
Cc: Robert.Regimbald@ic.gc.ca, daniel.brassard@bell.ca

Dear Sir,

On file, we have a copy of the notification file dated May 21st 2013 that was sent to concerned residents by Bell Mobility and a copy of the public notice that appeared in a local newspaper for the site located at 1111 chemin de la Vallee in Sutton.

At this time Bell is investigating the assumption that some residents did not receive the notification file. Once this matter is clarified, we will be able to assess compliance to the procedures outlined in the CPC-2-0-03. 

Best regards,

Robert Régimbald
Agent Gestion du Spectre | Spectrum Management Officer
Direction Générale des Opérations de la Gestion du Spectre | Spectrum Management Operations Branch
Industrie Canada | Industry Canada
975, boulevard St-Joseph Pièce 222, Gatineau QC J8Z 1W8 | 975 St-Joseph Blvd Room 222, Gatineau QC J8Z 1W8
Robert.Regimbald@ic.gc.ca
Téléphone | Telephone 819-953-1324
Télécopieur | Facsimile 819-953-8164
Téléimprimeur | Teletypewriter 1-866-694-8389
Gouvernement du Canada | Government of Canada


Christopher Freeman 19/10/2013 Photos
To: Robert.Regimbald@ic.gc.ca
Cc: daniel.brassard@bell.ca, alexandre.pelletier@bell.ca, francois.belanger@bell.ca, 


Outlook Active View

3 attachments (total 1139.1 KB)

View slide show (3)
Download all as zip

Attn:               Robert Régimbald
Daniel Brassard
Alexandre Pelletier    
Francois Belanger


In regards to Mister Brassard and Mister Régimbald’s emails, dated October 9th, 2013 and October 17th, 2013 respectively, please find our response as follows:

Mister Brassard wrote:
“A CPC (public consultation) as per the required CPC-2-0-03 was held from the 21st to the 21st June 2013 in Sutton-Jonction.”

Mister Régimbald wrote:
“On file, we have a copy of the notification file dated May 21st, 2013 that was sent to concerned residents by Bell Mobility…”

First off, no one disputes the date on the cover letter. It is clearly dated May 21, 2013. As well, the date of response clearly states June 22, 2013. These are documented facts.

The issue is what constitutes thirty days, as is specified in Section 4.2-2 of Industry Canada’s directive CPC-2-0-03:

“It is the proponent's responsibility to ensure that the notification provides at least 30 days for written public comment.”

As Mr. Régimbald states above, the file dated was sent May 21. Is this correct? We have no way of knowing when it was sent. Do you? Have you documentation of the date the package was sent? According to CPC-2-0-03 guidelines proponents “must keep a record of all associated communications.”

You certainly do not have documentation of when it was received by the local public. Why was the notification sent parcel post? Why was it not sent registered mail as we did with our response?

For the sake of this argument, we will take Mr. Brassard’s word that notification was sent May 21. This would mean the earliest the package would have been delivered to our communal post boxes would have been May 23 or 24.

Assuming us irregular rural residents check our mail daily – again, why was notification not sent by registered mail – the thirty days for written public comment would have been June 22 or 23. In other words, we would have had to mail our response by one of these dates.

June 22 was not the deadline date for Bell Mobility to receive our response but the date we were to send our response – you cannot have it both ways, one set of rules for your correspondence and another for ours.

These are time sensitive documents and must be respected as such.

We, the one hundred plus citizens of Sutton Junction sent our response June 20th, by registered mail. The package was signed for as received on June 25th, 2013 as can be verified by on-line tracking the attached receipts.

Therefore, it is clear Mr. Brassard and Bell Mobility are not in compliance with Industry Canada’s guidelines.


Secondly, if for some aberrant reason you wish to dispute the first argument, Bell Mobility still received our response on time:

June 22, 2013 – the date stated in Bell Mobility’s cover letter for public response was a Saturday. Sunday was the 23rd and June 24 was a provincial holiday. This would mean the deadline would actually of been June 25th. Which, as we have documented is the date Bell Mobility received our response.


Thirdly, on October 3rd, 2013 a unanimous resolution by the Sutton town council was made to halt the construction of the cell tower at 1111 chemin de la Vallee. The resolution was drafted on the 8th of October. Are you aware of this?

(Please read attached resolution)

If you are aware of this Mr. Régimbald, on what grounds do you claim in your email: “We will be able to assess compliance to the procedures outlined in the CPC-2-0-03.”

Does Industry Canada really wish to challenge a municipal resolution?


Furthermore, our numbers are growing each day, and we have now partnered with citizens’ groups in Potton and Bolton, Quebec. As well we have partnered with Canadians for Safe Technology (C4ST). Additionally, the press is becoming more numerous and more aware of our cause.


In closing, as to your additional query, Mr. Brassard: “Can you also tell me the names (residents of Sutton-Junction), who did not receive the CPC documents that were sent by mail?”

Why do you not know this? This is your responsibility as outlined in CPC-2-0-03. And why would you send me notification at 101, chemin Lakeside, Knowlton? I have not lived there for over ten years.

Until you, Mr. Régimbald and Mr. Brassard are able to address these inconsistencies, we have no faith in Industry Canada or Bell Mobility serving any of our community’s needs, telecommunication or otherwise.

Sincerely,

Chris Freeman,
Sutton Junction Citizens Group

P.S. I will be out of the country for several weeks. During my absence please correspond with Gilles Globensky: gillesglobensky@videotron.ca, Olivier Burnham: ollham@hotmail.com and Pierre Ménard, OMA, town manager: p.menard@sutton.ca